The 2025 ALARM Survey

2025 ALARM Survey

The 2025 ALARM Survey shows that the UK’s road maintenance backlog has reached £17 billion, with roads only resurfaced every 93 years. This highlights the urgent need for sustainable, cost-effective infrastructure solutions. Hydro Road offers eco-friendly technologies like Hydro Asphalt (HA) and Hydro Road Stabiliser (HRS), providing durable solutions for road repairs and construction. By adopting innovative methods, we can reduce costs and environmental impact, helping to tackle this growing infrastructure challenge.


Find out more:

https://www.asphaltuk.org/alarm-survey-page/

https://www.hydro-road.com